Henan Yuanda Boiler Co., Ltd.

Henan Yuanda Boiler Co., Ltd. Industiral Boiler Manufacturer Since 1956

Manufacturer from China
Active Member
8 Years
Home / Products / Coal Hot Water Boiler /

Water Tube Coal Hot Water Boiler , Biomass Bagasse Fired Hot Water Boiler

Contact Now
Henan Yuanda Boiler Co., Ltd.
City:zhengzhou
Province/State:henan
Country/Region:china
Contact Person:MissLuna
Contact Now

Water Tube Coal Hot Water Boiler , Biomass Bagasse Fired Hot Water Boiler

Ask Latest Price
Video Channel
Brand Name :Yuanda Boiler
Model Number :DZL
Certification :SGS,CE,ASME,ISO9001
Place of Origin :Henan,China
MOQ :1 set
Price :Be negotiated
Payment Terms :D/P, L/C, T/T, D/A
Supply Ability :1500 sets per year
Delivery Time :20 working days
Packaging Details :Wooden box for boiler accessories.
Product name :Water Tube Coal Hot Water Boiler Biomass Bagasse Fired Hot Water Boiler
Design fuel :coal,biomass,bagasse
Color :Silver,red
Operation :Automatic operation
Quality :High strict detection test
Boiler working life :More than 20 years
Boiler pressure :1.25MPa, 1.5MPa
Company :boiler manufacturer since 1956
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Water Tube Coal Hot Water Boiler Biomass Bagasse Fired Hot Water Boiler

1. Fuel:coal,biomass pellet

2. Capacity: 1ton - 20ton

3. Item: Automatic chain grate, running safety,automatic operation

4. Boiler model:SZL,DZL

SZL biomass coal fird hot water boiler

Boiler model Rated thermal power Rated pressure Rated outlet temp Return water temp Design efficiency Water volume Weight Dimension
MW Mpa % Ton mm
SZL1.4-0.7/95/70-AII 1.4 0.7 95 70 81 211 17 4850×2690×3462
SZL2.8-0.7/95/70-AII 2.8 0.7 95 70 81 423 22 5450×3040×3462
SZL4.2-1.0/95/70-AII 4.2 1 95 70 81 8.2 25 6100×3400×3500
SZL5.6-1.0/95/70-AII 5.6 1 95 70 81 10.7 29 6800×3400×3500
SZL7-1.0/115/70-AII 7 1 115 70 82 13.8 31 7600×3400×3500
SZL10.5-1.0/115/70-AII 10.5 1 115 70 82 17.6 42 9800×3400×3540
SZL14-1.0/115/70-AII 14 1 115 70 82 24.6 50 11000×3400×3540
SZL17.5-1.0/115/70-AII 17.5 1 115 70 83 31 52 8300×3000×3600

1.Design the cyclone chamber inside the chamber of the stove
When the high temperature smoke through the cyclone chamber,smoke rotate with high speed and burn thoroughly.Improve the heat efficiency of boiler,the big dust settle down ,achieve the result of secondary combustion and first dust removal.
Energy conservation,high efficiency,environment friendly
This design obtains national patient


2.Separate wind chamber structure
Make air regulation sensitive and make wind uniformly in landscape orientation in the reliable longitudinal wind chamber.
Resolve the wind plug,wind channeled,partial burn phenomenon,
The design obtains national patent.

Water Tube Coal Hot Water Boiler , Biomass Bagasse Fired Hot Water Boiler

DZL coal biomass fired hot water boiler

Boiler model Rated thermal power Rated pressure Outlet temp. Return water temp. Grate effective area Design efficiency Fuel consumption
MW MPa % Kg/h
DZL0.7-0.7/95/70-AII 0.7 0.7 95 70 1.85 80 110
DZL1.4-0.7/95/70-AII 1.4 0.7 95 70 3.4 80 222
DZL2.8-0.7/95/70-AII 2.8 0.7 95 70 5.18 80 432
DZL4.2-0.7/95/70-AII 4.2 0.7 95 70 7.55 81 633
DZL5.6-1.0/95/70-AII 5.6 1 95 70 9.34 80 855
DZL7-1.0/115/70-AII 7 1 115 70 12 80 1068
DZL10.5-1.0/115/70-AII 10.5 1 115 70 18 81 1587
DZL14-1.0/115/70-AII 14 1.25 130 70 22.85 81 2116
DZL21-1.25/130/70-AII 21 1.25 130 70 27.5 81 3160
DZL29-1.25/130/70-AII 29 1.25 130 70 34.5 81 4327

1. Return water eject to the high temperature tube plate
F: Improve the flow rate of high temperature tube plate and prevent subcooled boiling
P:prevent the tube plate cracking

2. Ejector pipe
F:Increase the flow rate of water on water cooling wall in order to prevent subcooled boiling
P:To prevent pipe explosion,Increase the reliability of water cycle

3. Smoke and dust separator chamber
F:Separate smoke and dust according to inertia
P:reduce the original effluent concentration of soot

4. Optimized design CAD
F:Choose the best furnace from dozens of options
P:improve economical efficiency

5. Convex tube plate
Function:improve tube plate flexibility,so as to reduce the heating stress of welded sew at the pipe end
Purpose:prevent tube plate cracking, cancel bracing,simplify the structure

6. Large size of simple circulation loop drop pipe and lower set box
F:Increase the flow rate of water on water cooling wall in order to prevent subcooled boiling
P:To prevent pipe explosion,Increase the reliability of water cycle

Water Tube Coal Hot Water Boiler , Biomass Bagasse Fired Hot Water Boiler

Inquiry Cart 0